Sunningdale Level Crossing Case StudyNewgate (Newark) Ltd are excited to see the continued deployment at Sunningdale Level Crossing of their newly developed Level Crossing Barrier Machine and associated Protection Cage technology, which have both been granted Product Approval by Network Rail for trial on several projects in the UK.

With more than 40 years’ experience with Barriers and continuous investment in R&D, Newgate (Newark) Ltd have industry leading strength within the barrier and gate security market.

Atkins – a member of SNC-Lavalin Group were awarded a multi-disciplinary contract for design & installation works to re-new the level crossing at Sunningdale, which falls within Phase 2 of the Feltham & Wokingham re-signalling Project. The overall Feltham & Wokingham re-signalling project covers the renewal of all signalling assets, with delivery broken down into six separate phases.

Within the early works scope of Phase 2, Sunningdale MCB-CCTV Level Crossing was subject to a full level crossing renewal and was successfully completed on 01st November 2021. The scope encompassed life extension works with additional barrier repositioning and carriageway realignment works to deliver a compliant level crossing solution to Network Rail.

Newgate have been working in partnership with Atkins for several years to develop and supply a new state of the art Level Crossing Barrier solution with improved reliability to reduce down time and whole lifecycle cost as part of the Network Rail drive of “Design for Reliability”.

Newgate (Newark) Ltd NGR18000 Rail Barrier has carried out more than three Million operations to date in our inhouse testing facilities and is designed to fit the current “legacy” barrier machine footprint without the need for expensive ground works.

To compliment this our Newgate (Newark) Ltd NGR18000 Rail Barrier Protection Cage has been designed to be easily retro fitted to existing BR843 machines, enabling you to eliminate the current hazards due to moving sidearms and balance weights within a very short time frame. For more information contact rail@newgate.uk.com.

Related Case Studies


Inside Sheffield United Stadium

Sheffield United FC

Following on from our first barrier installation of 2019 at Chelsea Football Club, Newgate have now been tasked with supplying an automatic challenger traffic barrier at Sheffield United FC.

More Details

Dale Community Primary School

Newgate encourage schools and their pupils to take an active role with their school security. The staff and pupils from Dale Community Primary School in Derby had a field trip to the factory to inspect their new gate.

More Details
Rising Arm Barrier at Mornhill Campsite

Mornhill CAMC Campsite

Newgate were involved in a project at Morn Hill CAMC Campsite in Winchester where we installed four of our Challenger rising arm barriers.

More Details
CTA Background

Can't find what you're looking for?

Our team can design and build truly unique products, tailored to your exact specifications. If you have a specialist requirement, please contact the team at Newgate today.

Contact the Team